Amara
Supply-chain operations, live

Run the whole chain from one screen.

Amara replaces the line-loading spreadsheet with a living system — orders, materials, production and shipment risk, computed the moment your floor reports in.

No signup. Runs in your browser.

SuppliersProduction linesBuyers12d5dDelta Textilesfabric · trimsZhang Trimstrims · labelsBASF ChemicalschemicalsLine 061,200/dayLine 07980/dayLine 081,050/dayEddie Bauer3 ordersZara2 ordersBTS1 order

Built from a real factory's master supply-chain structure.

Suppliers, lines and buyers in one graph

Live line loading, not spreadsheets

Configurable to any staged production flow

Live supply map

See the whole chain move.

Suppliers, lines and buyers in one graph. Lanes animate only when goods are actually in flight — an open PO, a running line, a shipment in transit. A calm chain looks calm; a busy one visibly moves. Click any node or lane to drill into the documents behind it.

SuppliersProduction linesBuyers12d5dDelta Textilesfabric · trimsZhang Trimstrims · labelsBASF ChemicalschemicalsLine 061,200/dayLine 07980/dayLine 081,050/dayEddie Bauer3 ordersZara2 ordersBTS1 order
Line loading board

The spreadsheet, made to think.

The exact columns your planners already use — order, ship date, plan qty, rest qty, will-run — but the math updates itself. Rest quantity, days of work and the will-run date recompute against each line's real output and working calendar. Ship-risk rows light up before they slip.

Line 07Free 2 Sep
OrderShip datePlan qtyRest qtyWill run
PO-104218 Aug4,2001,18018 Aug
PO-104722 Aug3,6002,45022 Aug
PO-105124 Aug5,0004,870Will run 30-Aug
PO-105529 Aug2,8002,80029 Aug
Materials & inventory

Nothing starts a line it can't finish.

Track fabric, trims, chemicals and packaging against every order — expected dates, PO status, in-house confirmation. "PO NOT RECV" becomes a signal the system acts on, not a sticky note. Behind it, an append-only stock ledger and goods receipts with four-point fabric inspection.

Order PO-1051 · materials
FabricReady
TrimsIn transit
ChemicalsPO not recv
PackagingReady
Fabric stock ledger4,820 m +1,200
Quality at source

No bulk run before the gate clears.

Cutting, sewing, wash, finishing — each stage holds until its test batch is inspected and released. HOLD → TESTING → APPROVED → BULK RELEASED, documented, so defects are caught at the process that made them, not at final inspection.

Test batch · Cutting, Line 08
Hold
Testing
Approved
Bulk released

Bulk cutting on Line 08 holds until this test batch is inspected and released.

Reporting

Know the risk before the buyer does.

Shipment-risk, line output, reject rates and lead-time performance — computed from the same floor data, exported to CSV in a click. Management opens Amara before the morning meeting instead of asking for the spreadsheet.

At-risk lines
2
of 8 lines
Output today
41,200
pcs
On-time
94%
last 30 days
Reject rate
1.8%
vs 2.5% target
One engine, many chains

Built for garments. Shaped to your chain.

Amara models any staged production flow — stages, resources, gates, materials, alerts and vocabulary are all configuration. The garment template ships ready; instantiate it, rename your lines, and go.

Stop copying numbers around a spreadsheet.

Set up your chain in an afternoon, or try it with real data in the sandbox first.

Try the demo